+7 (7292) 29-11-99
судостроение:
1 корабль или судно
в течение 24 месяцев;
судоремонт:
до 12 судов в год.
16 month
construction of production and infrastructure facilities,
technology acquisition
50% from own funds,
the rest is external investment, or credit funds of second-tier banks
LOCATION
For the implementation of the shipbuilding plant project in the suburbs of Aktau, a land plot was defined at the address: Mangistau region, Aktau, Umirzak village, coastal zone.
All required permits from local authorities and Kazkhstanee Government is in the process : accreditations, certificates, licenses
CONCEPT
Administrative complex, S=1200 m2, H=10 m
Warehouse hangar, S=1600 m2, H=15 m
Open warehouse, S=3200 m2
Production halls S=12000 m2, H=20 m
Laboratory complex S=1320 m2, H=5 m
Open slipways for assembly and outfitting works S=6424 m2,
Open slipways for dock repair S=3600 m2
Cross Slip
Overhead crane, lifting capacity 600 tons
Gantry crane, lifting capacity 50 tons, span 50 m
Gantry crane, lifting capacity 50 tons, span 30 m
Open storage shelving
INDUSTRIAL PREMISES
A site for receiving and storing materials with an open warehouse, with walk-through racks, a warehouse hangar 10 m high, an overhead crane 30 tons
Assembly and welding shop with sections:
Processing of the ship's hull, with metalworking, locksmith and welding posts.
Preparation of parts and assembly units for painting, with a chamber of a roller-type shot blasting machine QH6925, a zone for manual processing of products.
Painting, with the SPK GROUP painting line, including: a phosphating chamber, an open painting area, a sliding drying chamber.
Each section of the workshop is equipped with a 10-ton beam crane, transport trolleys, and a supply and exhaust ventilation system.
An open slipway for installation and outfitting of manufactured ships with slipway trucks and a transverse slipway,
Open slipway for dock repair of operated ships with slipway trucks,
Pier for lifting ships for dock repairs. with crane 600 tons.
Frame two-story building. On the ground floor there is an electrical assembly shop, a woodworking shop, a mechanical shop (repair of ship mechanisms), a laboratory, on the second floor there are utility rooms, a dining room.
Overhead crane (gantry for warehouse)
Crane beam
Open warehouse shelving
Cross slip.
LIFT AND LAUNCHING VESSELS
applies for:
lifting the ship for urgent welding or emergency work;
removal of the ship from the shore due to the departure of water;
scheduled survey of ships;
moving the ship to winter sludge;
lifting and moving offshore drilling stations;
giving buoyancy to construction objects.
lifted using the technology of pneumatic roller bags is as follows:
vessel carrying capacity 5300 tons,
vessel length 140 meters,
width 17 meters,
draft 3.6 meters.
ship dock weight 1600 tons
STAGES OF CONSTRUCTION OF THE AKTAU SHIPYARD